Haifa TieRods Project
September 12, 2017

Haifa Port Breakers

Nahshon, with cooperation with ARAS MARINE, building together the new water-break extension.
This is a Flagship project, with high engineering, Technical and Marine complexity.
Weighing 20 Tons each, massive rocks and Antifer Cubes were installed, according to it designated GPS point, In order to create the optimal barrier that will absorb wave energy.
צולל בונה שובר גלים